On July 6, Dave Graber told our club about the ongoing renovation project at the WSC Library. He noted the original building was built in the mid 1950's, with the south addition built in 1970. The facility has expanded from a "warehouse of books" to learning space. Dave said some of the challenges of the renovation included remaining open during construction and the difficulty of finding skilled regional tradesmen with the current local construction boom.
 
Graber was introduced by club member Darrell Miller.