Stenross BBQ Kitchen upgrade
Stenross Kitchen Stage 3
Another successful working bee and the project is one step closer to completion. The Stenross Museum BBQ kitchen is taking shape with the new floor being polished ready for sealing and the walls being clad with waterproof lining. The team did a fantastic job and I must thank Geoff Rayson for helping with floor on Tuesday and on Wednesday Scott, Dave, Chris C, Adrian, Pat, and Geoff for fixing and flushing the lining.
The great thing about doing ahands on project such as this is the opportunity for members to get together to show off their talents in building stuff. There is also a chance to have a good old chat and a beer after the days work, in a jovial
atmosphere. Thanks guys, I enjoyed the experience even though I was used up running around looking for left hand screws with a 32tpi spc in bright anodised finish for Scott. I reckon I did 100km around town getting things organised for him.
Chris