
Boré brings us this update from Moses regarding our water project in Ingin village in PNG. Moses writes;
I’m excited to let you know that the work is complete:
- Gutters installed
- Concrete slab for the tank
- Downpipes/drop into the water tank installed
- Pipework to 3 separate areas
- 3 concrete slab for tap stands
- 3 taps
Timothy and the Ingin Team did an excellent job. I’m impressed with how efficiently it was done.
Here are some photos.
Best regards,
Moses


