Po'ailani Project
Contact:
David Herrmann
10 Apr 2021 |
||
Windward Oahu Sunris
|
||
|
- Building E
- Underneath – Finish unrolling chain link fence Need Wire and 6’ Steel flat rod x 4
- Fill Dry Rot Need wood puddy and paint
- Wheel Chair Ramp
- Repair and Paint Need 2” x 2” x 4’ - Need 4 pieces, and screws. Also need paint
- Remove and replace AC Need AC Unit
- Behind the House
- Move stone slabs to behind the house, create landing.
Tools required:
- Gloves, shovels, pick-axe (help move stones)
Need to purchase:
- Paint brushes,
- 2”x2”x4’ wood (x4),
- paint,
- 6’ Steel flat rod x 4, 10’ bare wire,
- AC Unit