Posted by DAVID HAYFORD on Apr 13, 2018
David Hayford mentioned that he was happy to be able to get from his downtown office across the River to the Arena. The Main Street Bridge across the Fox was closed for repair. The Jackson Street Bridge was one lane each way, with heavy construction on the South side. 
 
Two days later I had a meeting on Witzel. The Wisconsin Street Bridge was closed. So I had to head back to Jackson Street (see above).
 
Later in the week I crossed the Oshkosh Avenue Bridge to see a sign that it will be closed April 16th).