Floor system replaced -- many thanks to our Club members!

 

In the summer of 2009, the Pavilion floor at Millenium Park was condemned and the structure was closed.  Due to poor ventilation and improper construction, the wooden floor and joists were rotting.

Our club authorized the repair as a major community project and with assistance from the Town of Creston, the floor deck and joists were removed in April 2010 and a new floor system was installed. 

The costs for the materials was shared by our Club and the Town of Creston.

Many thanks to the Club members who volunteered their time and talents to complete this project:


    Concrete Poured          Gino, Howard, Walt, Rick, Ron       Completed Project