Community Service
Posted by Mac Whyte
SUCCESSFUL PROJECT COMPLETED AT LOVE IN ACTION.
LiA Director Dina , Ed Gresham, Rotary Project Manager, Gustavo Marquez, Contractor
The project involved the following changes to expand the existing space;
- Knock out the two walls 8 ft high and 8 ft wide as shown on the graphic previously provided
- Build the new room 4.88 mtrs by 3.76 mtrs with ceiling the same height as existing rooms
- Level the floor in new room to same level as existing adjoining room
- Install floor tiles compatible with existing flooring
- In new room install windows [opening 1-2 ft high and 6 ft long for ventilation] near the top of the far side wall
- Install one ceiling fan and 2 electrical outlets and install a roof compatible with the roof in the existing property.
Additional space will result in increased revenue that adds money to:
- Lunch money for all 3-5 year old children attending Kindergarten
- Emergency Medical and Dental Expenses for all children [there is no other singular source of funds for this purpose.
- Supplement overall food funding
- Salaries for the LIA girls working the Bazaar receiving Retail Job Training
- General School Expense for all children
- Special School Contributions/ Celebrations
- Supplements the General Fund of LIA where needed.