Use the Back Key to close and return to the story list
|
On the first weekend, six holes were dug, and sonic tubes were placed and filled with cement. The cement mix will harden over the next week to build the platform. |
| | During the second weekend, the decking is carefully measured, leveled, and fastened, which supports all the weight of the people using the platform. |
|
During the third weekend of construction, the platform rails are being measured, cut, fitted, and attached to the ramp. |
| Paula Wanzer is our first Page Pond Trail Platform user. She found gliding up the ramps and maneuvering around the deck surface easy. |
|
|
Basking in the sun and a job well done after three weekends of construction work (Left to Right), Ronald Maher, Vernon Goddard, and Tim Bergquist deserve some warm rays of the sun. |
|