Hybrid Lunch Meeting, Roland Williams, GM CVSan
02 Nov 2021 |
||
Castro Valley
|
||
|
Roland Williams, CVSan General Manager, will describe two award-winning major projects by CVSan and the Oro Loma Sanitary District. The first is a cutting-edge ecotone, or horizontal levee, designed to mitigate sea level rise. The second is a nutrient optimization project, which has drastically reduced the amounts of algal-producing contaminants discharged to the San Francisco Bay.