Great news on our water project in Lima Peru.
 
 
Quick status update:
  • First system has been installed
  • Second system installation is being planned -- Scheduled for September.
  • Lima bank account has been opened. TRF is ready to pay as soon as they receive confirmation from Lima Sunrise that they have deposited their $100 contribution.
 
 
Neighborhood of El Centro Bautista
 
 
The water purification system. Water is passed through three filters,
then injected with ozone. Bottles are washed and sanitized
in the sinks on the right.
 
 
Part of the education program in progress