The start, the mess,moss and mould.
More rubbish and dirt etc.
Killing the mould and mildew.
After water blasting into the hospital building.
The 800 x 50 mm timber border around entire top of wall, bolted through to a 800 x 50 on other side of wall every 600mm. This will carry the trusses and the roof, new steel reinforcing rod is tied to the original reinforcing rods so Building secured from bottom to top. The bond beam fixing and concrete will be complete today.
The steel brackets are bolted through the old concrete and the new bond beam and the 800 x 50 timber collar.
Hope this brings you all up to date. Thanks for all the support.
Best wishes, Geoffrey
Geoffrey Amos